Our work in the Dior store at Yorkdale Shopping Centre spanned two weeks in 2019 and saw us revitalize over 5,000 sq ft of flooring. Nearly 3,000 sq ft of 1 x 1 metre panels were installed as well as 2,000 sq ft of engineered hardwood, which was glued down on concrete with a border around the entire space.
We also sealed the concrete for moisture protection prior to installing the floors. This project, which was coordinated by SAJO construction, is still a source of immense pride for us and reflects some of our best commercial work.